300kW/645kWh Industrial Park Solar PV Solar + BESS Project in Germany

Delivery time: Mar, 2024

Delivered products: 3*100kW/215kWh MAX LI-POWER integrated outdoor battery energy storage cabinet

Application: This integrated solar + BESS is designed to address grid capacity limitations. By combining PV, BESS, and the grid, it overcomes the existing grid capacity constraints, resolving the issue of insufficient grid connection capacity. During the day, excess solar power is stored in the BESS and used to supply the office park’s load at night, forming an independent microgrid that improves energy utilization efficiency and reduces electricity procurement costs. Furthermore, with 100% green power supply, the park achieves energy self-sufficiency, reducing dependence on the traditional grid, enhancing energy independence, and lowering carbon footprint, while supporting the park in reaching higher environmental standards and sustainability goals.