200kW/430kWh Farm Solar + BESS Project in Netherlands

Delivery time: Nov, 2023

Delivered products: 2*100kW/215kWh MAX LI-POWER integrated outdoor battery energy storage cabinet

Application: The excess electricity generated by the photovoltaic system in the farm is stored in the BESS. The farm can call upon the stored energy at any time during periods of insufficient sunlight or peak electricity demand, ensuring the stability of energy supply. This reduces dependence on the utility grid, lowers operational costs, prevents waste of photovoltaic power generation, and improves energy efficiency.

 

Add comment

Your email address will not be published. Required fields are marked

Related Articles