2000kW/4000kWh Power Frequency Regulation Project in Spain

Delivery time:Jan, 2024

Delivered products:2 sets 1000kW/2000kWh MaxCube integrated outdoor battery energy storage cabinets for Spain

Application:BESS container used for wind turbine power plant for energy storage and frequency regulation. The system is scheduled by the customer’s local controller to achieve stable and reliable power supply.

Add comment

Your email address will not be published. Required fields are marked

Related Articles